Showing posts with label News. Show all posts
Showing posts with label News. Show all posts

Sunday, September 16, 2018

RENEWABLE ENERGY POLICY OF WEST BENGAL


West Bengal, contrary to its name, is located in the Easter part of India and is one of the most populated stated in the country. The capital city of West Bengal os Kolkata, which was famously called as Calcutta in the time of British rule. West Bengal has about 23.07MW of connected solar power as of January 2017. Out of this more than 50%, 15.30MW to be exact was commissioned in the Financial Year 2016/17. In the year of 2016, more than 190 schools in West Bengal saw solar power systems installed. The state government has ambitious plans and more than 1300 government buildings, hospitals and schools have been identified to help install about 180MW of solar in the next couple of years. The target for the Financial year 2017-18 has been set at 120MW and the government in all is expected to spend about Rs 1000 crore overall on the project. Not just the villages and cities, but also the islands of Sundervans have been discussed as areas that are currently facing a shortage of power. Solar as a possible solution is attractive but the difficulty in land acquisition for projects has put the state behind. A new policy too is expected in West Bengal to help set up the action plan, helping the state to achieve the target of 4,500MW of solar power by the year 2022 that the state has set.
RENEWABLE ENERGY POLICY OF WEST BENGAL
Objectives of the Policy
The objective of the Renewable Energy Policy for this State is to promote and facilitate the growth of generation of electricity from renewable energy sources by way of optimum utilization of the RE potential in the State.
Wind Farms
To exploit the wind potential of the State, the Nodal Agency shall initially undertake a comprehensive wind resource assessment and offer the identified potential sites for development. Government-owned wasteland in areas having minimum annual mean Wind Power Density (WPD) of 200 Watt/m2 measured at a hub height of 50 meters and using new generation wind turbine generators will be offered for setting up of wind projects.
Biomass Projects
An additional 224 MW of biomass power has been targeted for achievement by the year 2017. In West Bengal, rice husk is a primary feedstock for biomass projects. However, other forms of agricultural waste like wood, straw, maze, energy plantation, etc. are also being considered for generating biomass power in West Bengal. Feedstock availability and pricing are the critical determinants of success for biomass plants. In order to ensure feedstock availability, energy plantations will be promoted. For this, barren Government land, waste land, as well as degraded forest land shall be made available.
Solar Photovoltaic
There is a target to harness 82 MW of solar power through grid connected projects and 18 MW of solar power through rooftop and smaller solar installations by 2017. The State intends to encourage the development of solar power by providing favorable atmosphere for promising Solar Developers. Apart from grid-connected solar power, the State is targeting huge capacity addition through rooftop and smaller solar installations. The comprehensive solar Policy for cities. The byelaws shall be amended with due mandatory provisions for providing solar energy infrastructure, right at planning/building stage, both for residential and commercial categories. It shall be mandatory for all the public buildings to have solar devices to meet electricity requirements and other applications. All existing and upcoming commercial and business establishments having more than 1.5 MW of contract demand will be required to install solar rooftop systems to meet at least 2% of their total electrical load. Further, all the existing and upcoming schools and colleges, hospitals, large housing societies and Government establishments having a total contract demand of more than 500 KW will be required to install solar rooftop systems to meet at least 1.5% of their total electrical load. West Bengal has on an average 300-330 sunny days, with solar insolation 5-5.5 (kwh/m2/day). West Bengal has initiated a net-metering solar rooftop model to promote self-consumption. The system size limited to 2-100 kW, Connectivity is allowed at Low Voltage or Medium Voltage, or 6 KV or 11 KV, of the distribution system of the licensee. Policy targets 16 MW of rooftop and small PV installations by 2017.
MAIN FEATURES OF POLICY
       WBGEDCL (West Bengal Green Energy Development Corporation Limited) will be the Nodal Agency and will facilitate investment and involvement in the RE sector of the State. WBREDA will promote new renewable energy technologies through demonstration projects. Allotment of Projects through Competitive Bidding
       The Nodal Agency shall release in the public domain a Request for Proposal (RfP) for inviting prospective developers to submit their proposals.
       Bidders qualified on fulfilling minimum requirements at pre-qualifying stage will be considered for next stage of technical and financial evaluation. The developer offering the highest discount on the WBERC (West Bengal Electricity Regulatory Commission) ceiling tariff for the concerned RE technology will be invited to negotiate for signing the PPA.
       A developer can bid for full or part capacity/quantity of a specified RE Project.
Land for R.E. Project Development
        For cases where Government vested land is available, the permission for use of such land will be given for 30 years or the project life whichever is less. Vested land will be allocated and transferred to the WBGEDCL, which will then lease the land to the renewable energy developers.
        For projects on private land the developer will arrange the entire required quantum of land through direct purchase from / suitable agreement with the land owner. R.E. projects may not require conversion of private /agricultural land to non agriculture purposes subject to necessary government orders passed for these purposes.
        The allotment of land, if any, shall stand cancelled if the power project is not started within the time frame in accordance with the time limits as stipulated in the Implementation Agreement.


Clearance
The Nodal Agency will act as a Single Window for obtaining assistance from all line Departments.



MORE DETAILS
SOLAR ENERGY  POLICY
TARGET
As per MNRE there is a target to harness 5336 MW of solar power through grid connected projects and through rooftop in the state.
LAND ALLOTMENT
                    Government land, if available, permission for use will be given for 30 years or the project life whichever is less.
                    Land to be allocated and transferred to WBGEDCL, which will then lease the land to the developers.
                    For projects on private land developer to arrange the entire required quantum of land through direct purchase / suitable agreement with the land owner.
                    E projects may not require conversion of private /agricultural land to non agriculture purposes subject to necessary government orders passed for these purposes.
                    The allotment of land, if any, shall stand cancelled if the power project is not started within the time frame in accordance with the time limits as stipulated in the Implementation Agreement.
INCENTIVES
                    Exemption of demand cut to the extent of 50% of the installed capacity assigned for captive use purpose will be allowed subject to the Regulations of the Commission.
                    The host and obligated distribution utilities shall provide revolving Letter of Credit from a nationalized bank as a payment security mechanism for all RE projects.
                    Developer/Government acquiring land to provide an amount not exceeding one percent (1%) of the project cost for the rehabilitation and resettlement of the persons displaced from the project area.
                    In case of RE project construction in very remote areas, some infrastructural support including approach roads to the project site may be provided at Government cost.
SALE OF POWER AND TARIFF
                    All the electricity generated from the renewable energy projects established within the State of West Bengal are to be preferably sold to the distribution licensees within the State of West Bengal.
                    All transactions between W B S E T C / D i s t r i b u t i o n Licensee and the developer involving wheeling or sale of power will be settled on a monthly basis as per PPA and transmission service agreement executed. Power Evacuation and Grid Interfacing.
                    The evacuation infrastructure cost beyond the inter-connection point to be borne by the licensees which is to be recovered from consumers as per suitable pricing framework developed by WBERC.
                    Interfacing equipment and associated switchgear as well as their maintenance to be undertaken by developers at their own cost.
                    West Bengal Solar Policy and it's Solar Highlights
APPLICABLE POLICIES
ROOFTOP
                    Mandatory for all large housing societies having a total contract demand of more than 500 kW will be required to install solar rooftop systems to meet at least 1.5% of their total electrical load.
SUBSIDY
                    30% subsidy on the cost of solar system from MNRE (Central Government) through State Nodal Agency subject to approval & availability of funds.
Vision
                    Ensuring greener generation of electricity for future generations
                    To promote generation of electricity from renewable energy resources available in the State,
                    To create a conducive environment for participation of the public sector, private developers and smaller communities in the development of RE-based power projects in the State.
                    To generate value for the stakeholders, as well as for the State.


WIND ENERGY POLICY MORE DETAILS
WBREDA installed 8 X 250 kW Wind Energy Generators at Freserganj. One machine is out of order but other machines are in operating condition. WBREDA is getting service charge from WBSEDCL by selling power to their grid. WBREDA has prepared a proposal for installation two more Wind Electric Generation Projects with capacity 1 X 250 kW each at Ganga Sagar & Beguakhali in Sagar Island under South 24 Parganas District.
Wind – Diesel Hybrid :
WBREDA is operating a Wind-Diesel-Gasifier Hybrid Power Projects having 4 x 50 kW WEG, 2 x 180 KVA DG Sets and 1 x 150 kW Biomass Gasifier (Duel Fuel type).  The project has been funded by MNRE, Govt. of India; ICEF & the State Government. The Project was conceived as a Technology Demonstration Project. 
Wind-Solar Hybrid :
WBREDA conceived a project proposal for installation of six numbers Wind-Solar Hybrid Projects for six different schools under Sagar Block in Sundarban. The main objective of the project is to provide power for operating Computers and Laboratory Equipments. Each hybrid system comprises of 3 kW Aero Generator and 3 kW PV with Battery Storage System. The total financial involvement for this purpose would be Rs.133.40 Lacs
Aero Generator :
WBREDA has installed four aero generators each of capacity 5 kW at two existing Solar PV Power Plants at Gayen Bazar 25 kW Solar PV Power Plant and at Moushuni 55 kW Solar PV Power Plant of Sundarbans. WBREDA is facing problem in maintain the Aero Generators. Three Aero Generators have been badly damaged due to Aila. WBREDA already informed the matter to MNRE Government of India for providing fund in restoring the systems. Performances of Aero Generators are found well particularly for the period from March to September.
New Projects of 2 MW capacity Wind Generation :
WBREDA has initiated a proposal for installation of 2 MW capacity Power Plant through Wind Energy.
Read More »

Thursday, June 4, 2015

Online College Admission System - Haryana

Saturday, May 23, 2015

E-Cigarettes

Saturday, March 28, 2015

Phone Calls Promising Undue Amounts/Bonuses

Issued in public Interest
Dear Policyholder,
We have been receiving certain complaints where our policyholders received phone calls promising undue amounts/Bonuses to them. Caller normally poses as if he is calling from LIC office or IRDA office.
Before disclosing any information you are requested to check the genuineness of the call. It can be checked through your regular agent. You can also call on IVRS number 1251 or send an e-mail at co_crm_fb@licindia.com.
In case ,it is known that you had received a fake or spurious call please file an FIR with the police and lodge complaint at TRAI regulated phone number ‘1909’ with your mobile /landline on which spurious call was received within 3 days of receipt of such call. Please send a copy of complaint to LIC also.
Assuring you of our best services always.

Executive Director (CRM)
LIC of India
Read More »

Sunday, March 22, 2015

Punjab JET 2015

Monday, March 2, 2015

Budget 2015 Effects

Saturday, January 31, 2015

Revised Datesheet 10th Punjab

Thursday, January 8, 2015

CBSE 10th and 10+2 Datesheet 2015 Final

Monday, January 5, 2015

Date Sheet 10th and 10+2 Examination February 2015 - PSEB

Friday, December 19, 2014

Punjab Schools Winter Holidays From Tomorrow

In view of intense cold wave and extreme weather conditions, the Punjab Chief Minister Mr. Parkash Singh Badal today announced to pre-pone winter break in the government schools across the state
from tomorrow i.e. December 20 instead of December 25 as declared earlier.

Disclosing this here today a Spokesperson of the Chief Minister’s Office said that all the Punjab Government Schools would remain closed from tomorrow till December 31st. It may be recalled earlier winter vacations in the government schools was scheduled from December 25 to 31, 2014
Punjab govt announces winter holidays from tomorrow upto 31 Dec.
Read More »

Tuesday, December 16, 2014

Local Body Schools Transferred to ED Punjab

  • The Punjab Cabinet also gave nod for transferring 201 schools (495 ETT teachers with post) working in Urban Local Bodies to the Education department and merging them with the cadre of ETT teachers in Education department.


  • According to a press release, with this amendment, during the Probation period for two years the new appointee would be paid only the basic pay and after the successful completion of probation period, full salary would be admissible to the employees.

        However, these conditions would not be applicable in case of PCS (Judicial).
Read More »

Friday, December 12, 2014

Pragati - Scholarship for Girls

To provide encouragement and support to Girl Child to pursue technical education Pragati Scholarship has been launched by the Government from the year 2014-15. The salient features of the Pragati Scholarship are as under:

(i) Number of scholarship per annum: 4000

(ii) One Girl per family whose family income is less than Rs.6 Lakhs per annum

(iii) The candidates will be selected on merit at the qualifying examination

(iv) The candidates should have been admitted to 1st year of the Degree or diploma programme in any of the AICTE approved institute during the academic year 2014-15 through centralized admission process of the State /Central Government.

(v) Amount of scholarship: Tuition Fee of Rs. 30000/- or at actual, whichever is less and Rs. 2000/- per month for 10 months as incidentals each year.

At present, the Government does not propose to revise the eligibility criteria and other conditions of the Pragati Scholarship.

This information was given by the Union Human Resource Development Minister, Smt. Smriti Irani in a written reply to the Lok Sabha question.


Read More »

Wednesday, December 10, 2014

Attempt to suicide no longer a crime in India

NEW DELHI: The government has decided to decriminalize "attempt to suicide" by deleting Section 309 of the Indian Penal Code from the statute book. 

Stating this in reply to a question in the Rajya Sabha on Wednesday, minister of state for home Haribhai Parathibhai Chaudhary said the government had decided to drop Section 309 from the IPC after 18 states and 4 Union territories backed the recommendation of the Law Commission of India in this regard. 


आत्महत्या की कोशिश अपराध की श्रेणी से हट जाएगी। विधि आयोग की सिफारिश पर मोदी सरकार ने आईपीसी की धारा 309 (आत्महत्या की कोशिश) को खत्म करने का फैसला किया है। धारा 309 के तहत आत्महत्या की कोशिश पर एक साल तक की सजा और जुर्माने का प्रावधान है। बुधवार को संसद में इसकी जानकारी देते हुए गृह मंत्रालय ने कहा कि 18 राज्य और 4 केंद्र शासित क्षेत्र धारा 309 को खत्म करने के पक्ष में हैं। गृह मंत्रालय के बयान में कहा गया है कि राज्यों की राय पर केंद्र सरकार ने फैसला किया है कि इस धारा को आईपीसी से हटा दिया जाए। 

लोकसभा में अगस्त में गृह राज्यमंत्री किरेन रिजिजू ने कहा था, 'विधि आयोग ने अपनी रिपोर्ट में कहा था कि आत्महत्या की कोशिश को मानवीय आधार पर विचार करने और इसके अपराध की श्रेणी से बाहर रखने की जरूरत है।'


आत्महत्या को अपराध की श्रेणी से अलग रखने की बात करते समय यह साफ कर दिया गया है कि किसी व्यक्ति को आत्महत्या करने के लिए प्रोत्साहित करने या इसमें उसकी सहायता करने वाले को अवश्य दंडित किया जाना चाहिए।

आत्महत्या को मानवीय पहलू से परखते हुए आयोग ने कहा है कि ऐसे व्यक्ति को दंडित करना उचित नहीं है, जो पारिवारिक अनबन, विपन्नता, नजदीकी रिश्तेदारी की मृत्यु आदि कारणों से अपना जीवन खत्म करने का फैसला कर लेता है। आयोग ने कहा है कि कि जीवन से हारे ऐसे अभागे व्यक्ति को सहानुभूति, सलाह मशविरे और उचित इलाज की जरूरत है। उसकी जगह जेल खाना नहीं है। आयोग के अनुसार आत्महत्या संबधी धारा-309 दोहरे दंड का कारण बनती है। जो व्यक्ति आत्महत्या का प्रयास करने के कारण पीड़ा और अपमान झेल चुका है, उसे कानून के जरिए दंडित करना उचित नहीं है। 
Read More »

Free calls to landline and mobile phones

A new app has made it possible to make calls on landline and cell phones for free in 85 countries.
Call+ app lets you make free calls to landline and mobile phones alike without anyone needing the app at the other end, CNET reported.
Available for Android and iOS devices, Call+ lets you call both landlines and mobiles and it shows your existing phone number as the caller ID.
You can make unlimited free calls to anyone in the continental US and landlines in Mexico, China and Brazil.
But if you want to call a different country, you have two options.
You can buy one day of unlimited-calling service for 99 cents, two days for $1.99 and a month for $19.99.
Unlike smartphone apps that need both phones to have the app installed, the Call+ app allows free voice calls even to phones without the app.
Call+ also allows users to complete various "partner" offers in exchange for days of service.
Signing up with dating service Zoosk can earn you seven days or buying a customised holiday ornament from Personal Creations can earn you seven days.

Earning many of the offers only requires users to spend some more time, the report added.
Read More »

Thursday, November 27, 2014

Income Tax AY 2015 - 16 (FY 2014 - 15)

·        Income up to Rs 2.5 lakhs for General Public and up to Rs. 3 lakhs for Senior citizens are now exempted from paying Income tax.
·        The exemption limit for investments under section 80C has been raised from Rs  1 Lakh to Rs 1.5 Lakhs.

·        The exemption on paying interest on Home Loan has been raised from Rs 1.5 Lakhs to Rs 2 Lakh.


Read More »

Monday, November 24, 2014

Is Your child is dyslexic?






with thanks from the tribune 23/11/2014

Read More »

Thursday, May 17, 2012

Morning News

Saturday, March 31, 2012

ਸਿੱਖਿਆ ਦੇ ਅਧਿਕਾਰ ਕਾਨੂੰਨ ਤਹਿਤ ਬਣਨਗੀਆਂ ਨਵੀਆਂ ਸਕੂਲ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀਆਂ

ਸਿੱਖਿਆ ਦੇ ਅਧਿਕਾਰ ਕਾਨੂੰਨ ਤਹਿਤ ਬਣਨਗੀਆਂ ਨਵੀਆਂ ਸਕੂਲ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀਆਂ

Posted On March - 30 - 2012
ਪੱਤਰ ਪ੍ਰੇਰਕ
ਫਾਜ਼੍ਰਿਲਕਾ, 30 ਮਾਰਚ
ਭਾਰਤ ਸਰਕਾਰ ਦੇ ਸਿੱਖਿਆ ਦੇ ਅਧਿਕਾਰ ਕਾਨੂੰਨ-2009 ਤਹਿਤ ਹੁਣ ਸਕੂਲਾਂ ਦਾ ਪ੍ਰਬੰਧ ਚਲਾਉਣ ਲਈ ਨਵੀਆਂ ਸਕੂਲ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀਆਂ ਦਾ ਗਠਨ ਕਰਨ ਸਬੰਧੀ ਜ਼ਿਲ੍ਹੇ ਦੇ ਸਾਰੇ ਸੀਨੀਅਰ ਸੈਕੰਡਰੀ, ਹਾਈ, ਮਿਡਲ ਅਤੇ ਪ੍ਰਾਇਮਰੀ ਸਕੂਲਾਂ ਦੇ ਮੁਖੀਆਂ ਨੂੰ ਪੱਤਰ ਤੇ ਹਦਾਇਤਾਂ ਜਾਰੀ ਕਰ ਦਿੱਤੀਆਂ ਗਈਆਂ ਹਨ।
ਇਸ ਸਬੰਧੀ ਜਾਣਕਾਰੀ ਦਿੰਦਿਆਂ ਸੰਦੀਪ ਕੁਮਾਰ ਧੂੜੀਆ ਜ਼ਿਲ੍ਹਾ ਸਿੱਖਿਆ ਅਧਿਕਾਰੀ ਫਾਜ਼ਿਲਕਾ ਨੇ ਦੱਸਿਆ ਕਿ ਰਾਈਟ ਆਫ ਚਿਲਡਰਨ ਟੂ ਫਰੀ ਐਂਡ ਕੰਪਲਸਰੀ ਐਜੂਕੇਸ਼ਨ ਐਕਟ-2009 ਦੀ ਧਾਰਾ 21 ਅਤੇ ਪੰਜਾਬ ਰਾਈਟ ਆਫ ਚਿਲਡਰਨ ਟੂ ਫਰੀ ਐਂਡ ਕੰਪਲਸਰੀ ਐਜੂਕੇਸ਼ਨ ਰੂਲਜ਼-2011 ਦੇ ਨਿਯਮ 13 ਅਨੁਸਾਰ ਹਰੇਕ ਸਕੂਲ ਲਈ ਪਹਿਲਾਂ ਚੱਲ ਰਹੀਆਂ ਪੇਂਡੂ ਸਿੱਖਿਆ ਵਿਕਾਸ ਕਮੇਟੀਆਂ (ਪਸਵਕ) ਤੇ ਸ਼ਹਿਰੀ ਸਿੱਖਿਆ ਵਿਕਾਸ ਕਮੇਟੀਆਂ (ਸਸਵਕ) ਦੀ ਥਾਂ ’ਤੇ ਸਕੂਲ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀਆਂ ਗਠਤ ਕੀਤੀਆਂ ਜਾਣਗੀਆਂ।
ਉਨ੍ਹਾਂ ਦੱਸਿਆ ਕਿ ਪਹਿਲੀ ਅਪਰੈਲ 2012 ਤੋਂ ਨਵੀਂਆਂ ਸਕੂਲ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀਆਂ ਕਾਰਜ ਸੰਭਾਲਣਗੀਆਂ ਅਤੇ ਇਨ੍ਹਾਂ ਦਾ ਕਾਰਜਕਾਲ 2 ਸਾਲ ਹੋਵੇਗਾ। ਹਰੇਕ ਸਕੂਲ ਲਈ ਪ੍ਰਬੰਧਕ ਕਮੇਟੀ ਦਾ ਗਠਨ ਕਰਨਾ ਲਾਜ਼ਮੀ ਹੋਵੇਗਾ। ਸ੍ਰੀ ਧੂੜੀਆ ਨੇ ਦੱਸਿਆ ਕਿ ਨਵੀਆਂ ਗਠਤ ਹੋਣ ਵਾਲੀਆਂ ਕਮੇਟੀਆਂ ’ਚ ਇਕਸਾਰਤਾ ਰੱਖਣ ਲਈ ਮੈਂਬਰਾਂ ਦੀ ਕੁੱਲ ਗਿਣਤੀ 12 ਹੋਵੇਗੀ। ਇਨ੍ਹਾਂ ’ਚ 9 ਮੈਂਬਰ ਬੱਚਿਆਂ ਦੇ ਮਾਪਿਆਂ ਜਾਂ ਸਰਪ੍ਰਸਤਾਂ ’ਚੋਂ ਲਏ ਜਾਣਗੇ ਜਿਨ੍ਹਾਂ ’ਚ 5 ਔਰਤਾਂ ਤੇ 4 ਪੁਰਸ਼ ਲੈਣੇ ਜ਼ਰੂਰੀ ਹਨ। ਉਨ੍ਹਾਂ ਦੱਸਿਆ ਕਿ ਪਹਿਲਾਂ ਕੰਮ ਕਰ ਰਹੀਆਂ ਪਸਵਕ ਅਤੇ ਸਸਵਕ ਕਮੇਟੀਆਂ 31 ਮਾਰਚ ਤੱਕ ਆਪਣਾ ਕੰਮ ਪੂਰਾ ਕਰਕੇ ਭੰਗ ਹੋ ਜਾਣਗੀਆਂ।
Read More »

ਸਾਰੇ ਸਕੂਲ ਇਕ ਵਿਭਾਗ ਅਧੀਨ ਹੋਣਗੇ

ਸਾਰੇ ਸਕੂਲ ਇਕ ਵਿਭਾਗ ਅਧੀਨ ਹੋਣਗੇ: ਮਲੂਕਾ

Posted On March - 30 - 2012
ਪੱਤਰ ਪ੍ਰੇਰਕ
ਰਾਮਪੁਰਾ ਫੂਲ, 30 ਮਾਰਚ
ਸਿੱਖਿਆ ਮੰਤਰੀ ਸਿਕੰਦਰ ਸਿੰਘ ਮਲੂਕਾ ਨੇ ਸੂਬੇ ਦੀ ਮੌਜੂਦਾ ਸਿੱਖਿਆ ਨੀਤੀ ਵਿੱਚ ਵੱਡੀ ਤਬਦੀਲੀ ਦਾ ਸੰਕੇਤ ਦਿੰਦੇ ਹੋਏ ਕਿਹਾ ਕਿ ਇਸ ਬਾਰੇ ਸੋਮਵਾਰ ਨੂੰ ਮੁੱਖ ਮੰਤਰੀ ਪ੍ਰਕਾਸ਼ ਸਿੰਘ ਬਾਦਲ ਨਾਲ ਹੋਣ ਵਾਲੀ ਮੀਟਿੰਗ ਵਿੱਚ ਅਹਿਮ ਫੈਸਲੇ ਕੀਤੇ ਜਾਣਗੇ।
ਇਥੇ ਪੱਤਰਕਾਰਾਂ ਨਾਲ ਗੱਲਬਾਤ ਕਰਦਿਆਂ ਸ੍ਰੀ ਮਲੂਕਾ ਨੇ ਦੱਸਿਆ ਕਿ ਮੁੱਖ ਅਧਿਆਪਕਾਂ ਦੀਆਂ ਤਰੱਕੀਆਂ ਬਾਰੇ ਸੂਚੀ ਸੋਮਵਾਰ ਨੂੰ ਜਾਰੀ ਕੀਤੀ ਜਾ ਰਹੀ ਹੈ, ਜਦੋਂ ਕਿ ਲੈਕਚਰਾਰਾਂ ਦੀਆਂ ਤਰੱਕੀਆਂ ਬਾਰੇ ਸੂਚੀ ਵੀ ਜਲਦੀ ਜਾਰੀ ਕੀਤੀ ਜਾਵੇਗੀ। ਉਨ੍ਹਾਂ ਦੱਸਿਆ ਕਿ ਹੁਣ ਸਿੱਖਿਆ ਵਿਭਾਗ ਵਿੱਚ ਕਿਸੇ ਵੀ ਅਧਿਆਪਕ ਨੂੰ ਤਿੰਨ ਮਹੀਨੇ ਤੋਂ ਜ਼ਿਆਦਾ ਛੁੱਟੀ ਨਹੀਂ ਦਿੱਤੀ ਜਾਵੇਗੀ। ਉਨ੍ਹਾਂ ਮੌਜੂਦਾ ਸਮੇਂ ਪ੍ਰਾਇਮਰੀ ਸਕੂਲਾਂ ਦੇ ਪੰਚਾਇਤੀ ਵਿਭਾਗ ਅਤੇ ਬਾਕੀ ਸਕੂਲਾਂ ਦੇ ਸਿੱਖਿਆ ਵਿਭਾਗ ਨਾਲ ਸਬੰਧਤ ਹੋਣ ਦੀ ਥਾਂ ਦੋਵਾਂ ਨੂੰ ਇਕ ਵਿਭਾਗ ਅਧੀਨ ਕਰਨ ਦੀ ਯੋਜਨਾ ਦੱਸੀ। ਜ਼ਿਲ੍ਹਾ ਬਠਿੰਡਾ ਵਿੱਚ ਵੱਡੀ ਗਿਣਤੀ ਵਿੱਚ ਮਿਡ-ਡੇਅ ਮੀਲ ਦੇ ਸੈਂਪਲ ਫੇਲ੍ਹ ਹੋਣ ਦੇ ਮਾਮਲੇ ਵਿੱਚ ਸ੍ਰੀ ਮਲੂਕਾ ਨੇ ਕਿਹਾ ਕਿ ਇਸ ਦੀ ਜਾਂਚ ਕੀਤੀ ਜਾਵੇਗੀ। ਸ਼ੈਲਰਾਂ ਵਿੱਚ ਗ਼ਬਨ ਦੇ ਮਾਮਲੇ ਸਾਹਮਣੇ ਆਉਣ ਬਾਰੇ ਪੁੱਛਣ ‘ਤੇ ਸ੍ਰੀ ਮਲੂਕਾ ਨੇ ਕਿਹਾ ਕਿ ਇਸ ਬਾਰੇ ਉੱਚ ਪੱਧਰੀ ਜਾਂਚ ਹੋਣੀ ਚਾਹੀਦੀ ਹੈ।
ਬਠਿੰਡਾ (ਨਿੱਜੀ ਪੱਤਰ ਪ੍ਰੇਰਕ): ਸਿੱਖਿਆ ਮੰਤਰੀ ਸਿਕੰਦਰ ਸਿੰਘ ਮਲੂਕਾ ਨੇ ਪੰਜਾਬੀ ਭਾਸ਼ਾ ਵਿੱਚ ਦਫਤਰੀ ਕੰਮ ਨਾ ਕਰਨ ਵਾਲੇ ਅਫਸਰਾਂ ਨੂੰ ਤਾੜਨਾ ਕੀਤੀ ਹੈ ਕਿ ਉਹ ਸਰਕਾਰੀ ਕੰਮ ਮਾਂ ਬੋਲੀ ਵਿੱਚ ਕਰਨ। ਅੱਜ ਜ਼ਿਲ੍ਹੇ ਦੇ ਅਫਸਰਾਂ ਨਾਲ ਪਲੇਠੀ ਮੀਟਿੰਗ ਵਿੱਚ ਸਿੱਖਿਆ ਮੰਤਰੀ ਨੇ ਆਖਿਆ ਕਿ ਜੋ ਅਫਸਰ ਮਾਂ ਬੋਲੀ ਨੂੰ ਲਾਗੂ ਕਰਨ ਵਿੱਚ ਅਣਗਹਿਲੀ ਵਰਤਣਗੇ, ਉਨ੍ਹਾਂ ਖ਼ਿਲਾਫ਼ ਬਣਦੀ ਕਾਰਵਾਈ ਕੀਤੀ ਜਾਵੇਗੀ।
ਸਿੱਖਿਆ ਮੰਤਰੀ ਨੇ ਜ਼ਿਲ੍ਹਾ ਸਿੱਖਿਆ ਅਧਿਕਾਰੀਆਂ ਨੂੰ ਕਿਹਾ ਕਿ ਇਹ ਵੇਰਵੇ ਇਕੱਤਰ ਕੀਤੇ ਜਾਣ ਕਿ ਕਿਸ ਸਕੂਲ ਨੂੰ ਇਮਾਰਤ ਦੀ, ਪੀਣ ਵਾਲੇ ਪਾਣੀ ਦੀ, ਫਰਨੀਚਰ ਜਾਂ ਵਿਦਿਆਰਥੀਆਂ ਦੀ ਕਿਸੇ ਹੋਰ ਜ਼ਰੂਰਤ ਨੂੰ ਪੂਰਾ ਕਰਨ ਦੀ ਲੋੜ ਹੈ। ਮੀਟਿੰਗ ਦੌਰਾਨ ਸਿੱਖਿਆ ਵਿਭਾਗ, ਭਾਸ਼ਾ ਵਿਭਾਗ, ਜਨ ਸਿਹਤ ਵਿਭਾਗ, ਸਿੰਜਾਈ ਵਿਭਾਗ, ਨਹਿਰੀ ਵਿਭਾਗ, ਪਾਵਰਕੌਮ, ਸੀਵਰੇਜ ਬੋਰਡ, ਪੰਚਾਇਤੀ ਰਾਜ, ਸਿੱਖਿਆ ਵਿਭਾਗ, ਸਮਾਜਕ ਸੁਰੱਖਿਆ ਵਿਭਾਗ, ਬਾਲ ਵਿਕਾਸ ਵਿਭਾਗ, ਸਮਾਜ ਭਲਾਈ ਵਿਭਾਗ, ਪੰਚਾਇਤੀ ਰਾਜ ਵਿਭਾਗ ਤੇ ਹੋਰ ਵਿਭਾਗਾਂ ਦੇ ਅਧਿਕਾਰੀਆਂ ਨੇ ਮੁਕੰਮਲ ਹੋ ਚੁੱਕੇ ਪ੍ਰਾਜੈਕਟਾਂ ਅਤੇ ਚੱਲ ਰਹੇ ਵਿਕਾਸ ਪ੍ਰਾਜੈਕਟਾਂ ਬਾਰੇ ਸ੍ਰੀ ਮਲੂਕਾ ਨੂੰ ਜਾਣਕਾਰੀ ਦਿੱਤੀ।
ਮੀਟਿੰਗ ਵਿੱਚ ਡਿਪਟੀ ਕਮਿਸ਼ਨਰ ਕਮਲ ਕਿਸ਼ੋਰ ਯਾਦਵ, ਜ਼ਿਲ੍ਹਾ ਪੁਲਿਸ ਮੁਖੀ ਡਾ. ਸੁਖਚੈਨ ਸਿੰਘ ਗਿੱਲ, ਵਧੀਕ ਡਿਪਟੀ ਕਮਿਸ਼ਨਰ (ਵਿਕਾਸ) ਡਾ. ਅਭਿਨਵ ਤ੍ਰਿਖਾ, ਕੁਮਾਰ ਅਮਿਤ ਅਤੇ ਐਸ.ਡੀ.ਐਮ. ਬਠਿੰਡਾ ਹਰਜੀਤ ਸਿੰਘ ਕੰਧੋਲਾ ਹਾਜ਼ਰ ਸਨ।
Read More »

Friday, February 24, 2012

Paswak to School Management Committee